11kV & 0.4kV Underground Cable Network in Misurata

Client / Owner: General Company for Establishing Administrative Centers

Excavation and installation of underground cables across multiple sites. Installed 5 electrical substations and connected necessary cables along with concrete culverts across several regions.

Electrical Infrastructure for Counter-Terrorism Force Camp

Client / Owner: Counter-Terrorism Force

Installation of a packaged electrical substation. Distributed 11kV cables (1000m) and 240V low voltage cables (3500m) within the camp, alongside constructing concrete culverts and distribution boxes.

Lighting Works for Counter-Terrorism Force Camp

Client / Owner: Counter-Terrorism Force

Installation of 121 lighting poles. Manufactured 121 concrete bases, excavated cable routes, and installed necessary wiring, distribution boxes, and control switches inside the camp.

Maintenance of Shuhada Al-Rameelah & Al-Zarouq Municipal Branch HQ

Client / Owner: Misurata Municipal Council

Included the completion of Al-Zarouq Municipal Branch HQ and partial modifications to Shuhada Al-Rameelah building.

Partial Maintenance of Misurata Public Lighting Department

Client / Owner: General Electricity Company of Libya (GECOL)

Installed a 175m2 corrugated iron awning, paved the courtyard, and completed minor lighting works within the department.

Maintenance of Mirbat Health Center & Qasr Ahmed Municipal Branch

Client / Owner: Misurata Municipal Council

Minor modifications to Mirbat Health Center including PVC doors, and completion of terrazzo tiling, doors, paving, and sewage tank for Qasr Ahmed Municipal Branch.

Maintenance of Rapid Maintenance Department Point in Ruwaysat

Client / Owner: General Electricity Company of Libya (GECOL)

Construction and maintenance of 2 offices, installation of a 90m2 corrugated iron awning, building electrification, and necessary finishing works.

Fencing for 30kV Substation site

Client / Owner: General Electricity Company of Libya (GECOL)

Construction of an 80m fence (4m height), plastering, painting, and installing fence lighting.

Fencing for Al-Ghairan Transfer Station

Client / Owner: Misurata Municipal Council

Executed a 350m fence including foundations and columns. Completed plastering and installed two 5.5m wide iron gates for entry and exit.

12 Bases for 220kV Cable Heads & Lightning Arresters

Client / Owner: Libyan Iron and Steel Company (LISCO)

Executed structural bases including deep excavation, sulfur concrete works, rebar, and bitumen coating under Turkish supervisory company.

Maintenance of Restrooms in Faculty of Science

Client / Owner: Misurata University

Redesigned, maintained, and fully restored the restrooms of the departmental building.

Two 120-Ton Truck Scales at Misurata Seaport

Client / Owner: Misurata Free Zone

Constructed bases for weighbridges and paved entrance/exit yards using 800m3 of reinforced concrete. Built an operation room, assembled scales, and calibrated them.

Maintenance of Municipal Branch, Civil Registry & Municipal Guard HQs

Client / Owner: Misurata Municipal Council

Fully equipped the headquarters including painting, plastering, electricity, plumbing, paving 1080m2 yard, and applying rolled bitumen for roof moisture treatment.

Fencing of 220kV Substation in Dafniya

Client / Owner: General Electricity Company of Libya (GECOL)

Construction of a 630m long and 3m high fence complete with plastering, painting, and building a dedicated guard room for the station.